Subscribe to continue reading
Subscribe to get access to the rest of this post and other subscriber-only content.
Subscribe to get access to the rest of this post and other subscriber-only content.
16 January 2025, Abu Dhabi, UAE: Etihad Rail, the developer and operator of the UAE National Railway Network, has introduced the region’s first-ever “CO2 Emission Avoidance and Reduction Certificates,” an innovative initiative that highlights the environmental benefits of rail transport for its customers.
This significant milestone reinforces Etihad Rail’s role as a key contributor to the UAE’s climate change agenda, aligning with the nation’s Net Zero by 2050 Strategy through a transparent Environmental, Social, and Governance (ESG) framework linked to the UN Sustainable Development Goals (SDGs).
Continue reading Etihad Rail Launches Region’s First Carbon Emission Avoidance and Reduction Certificates
Dubai January 16, 2025: Abu Dhabi Knight Riders secured their first victory at the DP World ILT20 Season 3, defeating Sharjah Warriorz by 30 runs at the Zayed Cricket Stadium in Abu Dhabi. Jason Holder picked up four wickets for just 23 runs and David Willey returned figures of three wickets for 19 runs to defend their total of 159/5 with ease.

Middle East Metallurgy, Corrosion & Coatings (MECOC) EXPO 2025 Witnessed 1000+ Experts from 60+ Countries Driving Sustainable Future for the Energy Industry
Abu Dhabi, UAE – January 2025 The highly anticipated Middle East Metallurgy, Corrosion & Coatings (MECOC) EXPO 2025 opened its doors from January 14 to 16 at the Conrad Abu Dhabi Etihad Towers, gathering global industry leaders, experts, and innovators to explore cutting-edge advancements in metallurgy, corrosion management, and non-metallic materials.

بقيمة 3.5 مليار درهم وعلى مساحة6 مليون قدم مربع
عقارات الكويت وايفا للفنادق تطلقان مشروع الطي هيلز بالشارقة
أعلنت شركة عقارات الكويت، الشركة العقارية الرائدة والمدرجة في بورصة الكويت، بالتعاون مع إيفا للفنادق والمنتجعات، عن إطلاق مشروع “الطي هيلز ” في إمارة الشارقة، بتكلفة إجمالية تصل إلى 3.5 مليار درهم. يمتد المشروع على مساحة تزيد عن 6 ملايين قدم مربع، ويشمل 1100 فيلا وتاون هاوس بتصاميم ومساحات متنوعة، تلبي مختلف احتياجات العملاء.
تتراوح وحدات المشروع بين 3 إلى 6 غرف نوم، موزعة على ثلاث مراحل تطويرية، حيث تتميز كل وحدة بوجود مسابح خاصة وتصاميم عصرية تجمع بين الفخامة والراحة.
ومن المقرر أن يتم تسليم المرحلة الأولى من المشروع في الربع الأول من عام 2028، مما يعكس التزام
